dam up
英 [dæm ʌp]
美 [dæm ʌp]
壅高;筑坝壅水;挡水
英英释义
verb
- obstruct with, or as if with, a dam
- dam the gorges of the Yangtse River
双语例句
- Thirdly, the framework of early-warning system for ill reservoir dam is set up with the Web GIS technology. Based on the above, the classification and the selection and the principle of the early warning index is studied, including the developing method for the index system.
构建了基于WebGIS的病险水库大坝预警系统架构,在此基础上,研究了预警指标的分类、预警指标筛选的条件和原则以及指标体系的构建方法。 - Along with the development of the West Regions, West-East electricity transmission project, South-to-North Water Transfer project are under way, there are more and more constructions of high dam and giant reservoir coming up.
随着西部大开发、西电东送以及南水北调等国家级大工程项目的开工建设,高坝大库的建设越来越多。 - A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.
因此一般采用上游坝面铺设复合土工膜和坝基垂直防渗措施进行防渗漏处理。 - In this paper, mainly based on arranging data with well pumping tests in dam foundation and sum up the laws of flows under the condition of deep well pumping, the useful dewatering calculation model and parameters were set up.
本文主要通过坝基现场抽水试验试验资料整理,在揭示黄土坝基降水特性规律的基础上,确定可以反映现场抽水条件的的实用降水计算模型和参数; - The dam body is mainly made up of dam shell, antiseepage, drainage, and protection slope.
土石坝坝体主要由坝壳、防渗体、排水设备、护坡等组成。 - The major contents are as follows: ( 1) According to the conservation of energy theory and the heat transfer theory, the heat transfer model of dam leakage is set up through the combination with the conservation energy equation and the heat transfer equation.
根据能量守恒原理、传热学理论,由能量平衡方程及热传导方程联合建立大坝渗漏传热模型。 - The problem of uplift pressure being higher in non-overflow sections at the right bank of Shiquan dam has come up since the first dam safety inspection, a lot of studies and work have been done but got lower effect.
石泉大坝右岸非溢流坝段扬压力超标问题自第一次安全定期检查提出后,曾做过大量的加固研究工作,但效果一直不明显。 - The forecast model of dam deformation is set up on the basis of the time alignment decomposition method.
基于时间序列分解法建立大坝变形预测模型。 - The analysis of planting trees to the different discharge in same base slopes at the same time mean velocity in section before and after explained vegetation dam can let up average current velocity in front and inside of dam, and turn the current velocity peak value even.
同时通过对相同底坡不同流量下植树前后断面平均流速的分析,说明了植物坝能较好的减小坝前和坝内的水流平均流速,并将流速峰值均匀化。 - On the basis of the technique of system simulation and the theory of queue stochastic simulation network, the queue network simulation model and the construction process simulation model for high roller compacted concret dam have been set up.
本文根据碾压混凝土坝施工特点,采用计算机系统仿真技术和排队随机仿真网格理论,建立了高碾压混凝土坝施工交通运输系统排队网络仿真模型和高碾压坝施工浇筑过程仿真模型。